Watt Energy Saver
  • Home
    • Sectors >
      • Agriculture
      • Construction
      • Commercial
      • Domestic >
        • Domestic Financial Support
        • Energy Saving Tips
    • Services >
      • Design Services
      • Planning
      • G100 & Export Control
  • Technologies
    • Photovoltaics >
      • System Size Based Upon Consumption
      • System Size Based Upon Part L
    • Biomass
    • Air Source Heat Pump >
      • Energy Efficient Boilers
    • Ground Source Heat Pump
    • Solar Thermal
    • Generators
    • Combined Heating & Power - CHP
    • Lighting
    • Electric Vehicle Charging (ELV)
    • Metering & Monitoring
    • Power Factor Correction - PFC
  • About
  • Testimonials
  • Contact
  • Case Studies
    • Solar PV >
      • Turners Soham
      • Nestle Fawdon
      • Nestle Tutbury
      • Derby University Sports Hall
      • Royal Cornwall Hospital
      • Schneider Electric - Coventry PV
      • Trans-Sport - PV
      • DE Brand - PV
      • Worksop Library - PV
      • Bannister Farm - Ground Mounted PV
      • Stud Farm - PV
Client
Nestlé is committed to climate change leadership and has set targets to reduce direct greenhouse gas emissions per ton of product by 35% since 2005.  The Fawdon site has been selected by Nestlé to act as a lighthouse for sustainability initiatives.  The ambitious project is based on a holistic sustainability plan, which aims to reduce the site’s GHG emissions and water consumption by 20% and 50% respectively and achieve 10% renewable energy use by the end of 2015.

System Overview
The Solar PV system was installed across 5 roofs and a small strip of land to the rear of the site (Ground mounted).  The Solar PV array consists of 1971 solar panels, connected to 18 Schneider CL inverters.

Benefits
The large standing load created by the 24 hour production process ensures that all the energy generated by the PV array will be consumed on site.
System Type
Solar PV
System Size
512.46 kWp
Annual Output
422,007 kWh
Annual CO2 Reduction
<223,241 kg/year


"The Nestle project has been one of the most satisfying to date. Working in a live food processing environment meant only the highest standards were acceptable, working closely with the site team, WES were able to deliver a project of which we can all be proud."

Craig Edmonds, Director at Watt Energy Saver
Back To Case Studies
Watt Energy Saver
Renewable Energy and Specialist Energy Engineers
Centre of Renewable Energy, East Drayton, Nottinghamshire, DN22 0LG
Tel: 0845 475 7710
Email: Support@WattEnergySaver.co.uk
© 2015 Watt Energy Saver All Rights Reserved

Cookie Policy    Privacy Policy    Website User Conditions
Picture