Watt Energy Saver
  • Projects
  • Clients
  • About
  • Contact
  • Services
  • Technologies

Project - Building One

Location - Silverstone

​System Size - 977.68 kWp
​
Annual Output - 842,953 kWh
Picture
Overview - 
​

The Aston Martin Formula One Team has unveiled its advanced headquarters at Silverstone, housing over 700 staff and boasting sustainable design with solar panels aiding in energy reduction. Watt Energy Saver is proud to have contributed by installing a solar array on the first of three buildings, supporting the team's environmental goals. We look forward to further collaborations in 2024 as the site expands, reinforcing our commitment to renewable energy in the high-octane world of Formula One.​

(Click image to enlarge)
Watt Energy Saver
Renewable Energy and Specialist Energy Engineers
Elizabeth House Latimer Way Sherwood Energy Village
​Ollerton Nottinghamshire NG22 9QW
Tel: 0845 475 7710
Email: [email protected]
© 2023 Watt Energy Saver All Rights Reserved

Cookie Policy    Privacy Policy    Website User Conditions
Picture