Watt Energy Saver
  • Projects
  • Clients
  • About
  • Contact
  • Services
  • Technologies

Project - DPD - Unit 4 Wingates

Location - Bolton

​System Size - 260.01 kWp
​
Annual Output - 212,694 kWh
Picture
Overview - 
​

Watt Energy Saver's installation of a PV system at DPD's Unit 4 building is a significant step towards DPD's ambitious environmental sustainability goals. DPD group has committed to a 43% reduction in greenhouse gas emissions by 2030 and a 90% reduction by 2040, aiming for net zero emissions by 2040, a decade ahead of the Paris Agreement timeline​​​​. This initiative exemplifies DPD's dedication to reducing emissions and integrating renewable energy solutions as part of their comprehensive sustainability strategy.
​
(Click image to enlarge)
Watt Energy Saver
Renewable Energy and Specialist Energy Engineers
Elizabeth House Latimer Way Sherwood Energy Village
​Ollerton Nottinghamshire NG22 9QW
Tel: 0845 475 7710
Email: [email protected]
© 2023 Watt Energy Saver All Rights Reserved

Cookie Policy    Privacy Policy    Website User Conditions
Picture